8,917 bytes added
, 02:54, 26 December 2020
m{{Infobox rail line
| box_width = 12em
| name = [[File:MRT Singapore Destination 6.png|25px]] [[File:MRT Singapore Destination 7.png|25px]]<br>{{rint|sg|ne}}<br>North East MRT line
| color = {{SMRT color|North East}}
| native_name = Laluan MRT Timur Laut<br />{{lang|zh|东北地铁线}}<br />{{lang|ta|வடக்கு கிழக்கு எம்ஆர்டி வழி}}
| logo =
| logo_width =
| image = Ne14hougang.jpg
| image_width = 300px
| caption = An Alstom Metropolis C751A train at [[Hougang MRT Station|Hougang]], bound for [[HarbourFront MRT Station|HarbourFront]].
| type = [[Rapid transit]]
| system = [[Mass Rapid Transit (Singapore)]]
| status = Operational <br> Under planning ([[Punggol Coast MRT station|Punggol Coast]])
| locale =
| start = [[HarbourFront MRT Station|HarbourFront]]
| end = [[Punggol MRT/LRT Station|Punggol]]<br>[[Punggol Coast MRT station|Punggol Coast]] ''(2023)''
| stations = 16 (excluding reserved station for NE2) <br /> 1 (''Under planning'')
| routes = 1
| daily_ridership = 579,000 (Q1 2017)
| open = {{start date and age|df=yes|2003|06|20}} <br />{{start date and age|df=yes|2006|01|15}} ([[Buangkok MRT Station|Buangkok]])<br />{{start date and age|df=yes|2011|06|20}} ([[Woodleigh MRT Station|Woodleigh]])<br /> {{start date and age|df=yes|2023}} ([[Punggol Coast MRT station|Punggol Coast]])
| close =
| owner = [[Land Transport Authority]]
| operator = [[SBS Transit (railway company)|SBS Transit]] ([[ComfortDelGro]])
| character = Fully underground
| depot = [[Sengkang Depot|Sengkang]]
| stock = [[Alstom Metropolis C751A|C751A]]<br /> [[Alstom Metropolis & Shanghai Electric C751C|C751C]]
| linelength = {{convert|20|km|mi|abbr=on}} (Operational)<br>{{convert|1.6|km|mi|abbr=on}} (''Under planning'')
| tracklength =
| tracks =
| gauge = {{RailGauge|sg|allk=on}}
| electrification = 1500V [[Direct current|DC]] [[Overhead catenary]]
| speed = limit of {{convert|90|km/h|mph|abbr=on}}
| elevation =
| map = [[File:MRT map NE.svg|265px]]
| map_state =
}}
The '''North East MRT Line''' ('''NEL''') is the third [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] line in [[Singapore]]. The line is 20 km long with 16 stations and operated by [[SBS Transit]]. Travelling from one end of this line to the other end takes about half an hour.<ref>''[http://www.sbstransit.com.sg/transport/trpt_nel_travel.aspx Travel Time]'', [[SBS Transit]]</ref> This line is coloured purple in the rail map.
The line joins central Singapore to the north-eastern part of the island. Transfer to the [[North South MRT Line|North South Line]] is done at [[Dhoby Ghaut MRT Station|Dhoby Ghaut station]], [[East West MRT Line|East West Line]] at [[Outram Park MRT Station|Outram Park station]], [[Circle MRT Line|Circle Line]] at [[Serangoon MRT Station|Serangoon]] and [[Dhoby Ghaut MRT Station|Dhoby Ghaut]] and [[Downtown MRT Line]] at [[Chinatown MRT Station|Chinatown]] and [[Little India MRT Station|Little India stations]].
This line is the first MRT line in Singapore to be completely underground (running in a [[tunnel]] all the way between HarbourFront and Punggol). It is also the first (and so far, the only) line where trains get their power from [[Overhead lines|overhead wires]] above the track, instead of a [[third rail]] beside the track.
All the trains on the North East Line are [[automatic train operation|automated]] ([[computer]]-controlled) and do not have an operator driving the train at the front. It is one of the world's first [[rapid transit]] lines that does not need drivers and is one of three such lines in the MRT network today. The others are the Circle Line and the Downtown Line.<ref>{{cite web|url=http://www.tsd.org/cbtc/projects/SIG_Singapore_AutomaticMetro_en.pdf|title=Singapore Northeast Line|publisher=[[Alstom]]|format=PDF}}</ref>
==Stations==
{{MRT route/North East|navbar=1|legend=0|collapse=yes}}
{| class="wikitable" style="margin-left:1em; margin-bottom:1em; color:black; font-size:95%;"
|- style="background:#{{SMRT color|North East}}; text-align:center; color:white;"
| '''Station number'''
| '''Station name'''
| '''Image'''
| '''Interchange/notes'''
|-
|{{SMRT code 2I/C|NE|1|CC|29}}||[[HarbourFront MRT station|HarbourFront]]||[[File:HarbourFront MRT Station, Aug 06.JPG|100px]]||Interchange with the [[Circle MRT line|'''{{fontcolor|#ff9a00|Circle line}}''']]
|-
|{{SMRT code|NE|2}}||reserved; under planning||||Reserve station to be open at a later date
|-
|{{SMRT code 3I/C|NE|3|EW|16|TE|17}}||[[Outram Park MRT station|Outram Park]]||[[File:Outram Park NEL Interchange, Entrance, Dec 05.JPG|100px]]|| Interchange with the [[East West MRT line|'''{{fontcolor|#009530|East West line}}''']] and the [[Thomson-East Coast MRT Line|'''{{fontcolor|#734538|Thomson-East Coast line}}''']] <small>''(2021)''</small>
|-
|{{SMRT code 2I/C|NE|4|DT|19}}||[[Chinatown MRT station|Chinatown]]||[[File:Chinatown MRT Station Platform 201401.jpg|100px]]||Interchange with the [[Downtown MRT line|'''{{fontcolor|#0354A6|Downtown line}}''']]
|-
|{{SMRT code|NE|5}}||[[Clarke Quay MRT station|Clarke Quay]]||[[File:Clarke Quay MRT.JPG|100px]]||
|-
|{{SMRT code 3I/C|NE|6|NS|24|CC|1}}||[[Dhoby Ghaut MRT station|Dhoby Ghaut]]||[[File:Dhoby Ghaut MRT 3.JPG|100px]]||Interchange with the [[North South MRT line|'''{{fontcolor|#dc241f|North South line}}''']] and the [[Circle MRT line|'''{{fontcolor|#ff9a00|Circle line}}''']]
|-
|{{SMRT code 2I/C|NE|7|DT|12}}||[[Little India MRT station|Little India]]||[[File:Little India MRT Station, Oct 06.JPG|100px]]||Interchange with the [[Downtown MRT line|'''{{fontcolor|#0354A6|Downtown line}}''']]
|-
|{{SMRT code|NE|8}}||[[Farrer Park MRT station|Farrer Park]]||[[File:Ne8 Farrer Park 2.jpg|100px]]||
|-
|{{SMRT code|NE|9}}||[[Boon Keng MRT station|Boon Keng]]||[[File:Boon Keng MRT 3.JPG|100px]]||
|-
|{{SMRT code|NE|10}}||[[Potong Pasir MRT station|Potong Pasir]]||[[File:Ne10potongpasir.jpg|100px]]||
|-
|{{SMRT code|NE|11}}||[[Woodleigh MRT station|Woodleigh]]||[[File:NE11 Woodleigh Platform B to Punggol.jpg|100px]]||
|-
|{{SMRT code 2I/C|NE|12|CC|13}}||[[Serangoon MRT station|Serangoon]]||[[File:Ne12 Serangoon 2.jpg|100px]]||Interchange with the [[Circle MRT line|'''{{fontcolor|#ff9a00|Circle line}}''']]
|-
|{{SMRT code|NE|13}}||[[Kovan MRT station|Kovan]]||[[File:Ne13kovan.jpg|100px]]||
|-
|{{SMRT code 2I/C|NE|14|CR|8}}||[[Hougang MRT station|Hougang]]||[[File:Hougang MRT Station (NEL) - Platform.jpg|100px]]||Interchange with the [[Cross Island MRT line|'''{{fontcolor|#a2ce2d|Cross Island line}}''']] <small>''(2029)''</small>
|-
|{{SMRT code|NE|15}}||[[Buangkok MRT station|Buangkok]]||[[File:Buangkok MRT Station 6, Aug 06.JPG|100px]]||
|-
|{{SMRT-SLRT code 2I/C|NE|16|STC|}}||[[Sengkang MRT/LRT station|Sengkang]]||[[File:NE16 Sengkang MRT Platform A.jpg|100px]]||Interchange with the [[Sengkang LRT line|'''{{fontcolor|#748477|Sengkang LRT}}''']]
|-
|{{SMRT-SLRT code 2I/C|NE|17|PTC|}}||[[Punggol MRT/LRT station|Punggol]]||[[File:NE17 Punggol MRT Platform and Escalator.jpg|100px]]||Interchange with the [[Punggol LRT line|'''{{fontcolor|#748477|Punggol LRT}}''']]
|-
! colspan="4" |North East line extension <small>''(under construction, to be ready by 2023)''</small>
|-
|{{SMRT code|NE|18}}||[[Punggol Coast MRT station|Punggol Coast]]||||
|}
The [[Land Transport Authority]] has announced that it will extend the North East Line from its current northern terminal at Punggol to a new station called [[Punggol Coast MRT Station|Punggol Coast]]. Construction will begin in 2018, and it is expected to open in 2023.
== References ==
{{reflist}}
==Other websites==
*[http://www.sbstransit.com.sg/transport/trpt_nel_overview.aspx North East Line (SBS Transit)]
*[http://www.lta.gov.sg/public_transport/pt_rail_nel.htm North East Line (Land Transport Authority)]
*[http://www.railway-technology.com/projects/sing-ne/ Railway Technology on the NEL]
{{Singapore MRT stations}}
[[Category:2003 establishments in Asia]]
[[Category:2000s establishments in Singapore]]
[[Category:Mass Rapid Transit (Singapore) lines]]