Changes

422 bytes added ,  20:21, 7 October 2023
m
KS update 1.3
Line 7: Line 7:  
The technical director or production manager will look at the designs and decide whether they are what he wants and whether there is enough [[money]] to built it.  Then a master carpenter will tell the people who work for him what they have to do.  There will be carpenters, [[plasterer]]s, [[welder]]s, [[painter]]s and, perhaps, several other [[craft]]smen.
 
The technical director or production manager will look at the designs and decide whether they are what he wants and whether there is enough [[money]] to built it.  Then a master carpenter will tell the people who work for him what they have to do.  There will be carpenters, [[plasterer]]s, [[welder]]s, [[painter]]s and, perhaps, several other [[craft]]smen.
    +
 +
== Set Construction Media ==
 +
<gallery widths='160px' heights='100%' mode='traditional' caption=''>
 +
File:Dresden - Scenography, set construction and theatrical scenery - 2601.jpg|A set under construction at the [[Semperoper]] in [[Dresden, Germany]].
 +
 +
File:Carnegie Mellon School of Drama set workshop.jpg|Set construction at the [[Carnegie Mellon School of Drama]].
 +
</gallery>
 
{{stub}}
 
{{stub}}
    
[[Category:Theater]]
 
[[Category:Theater]]
 +
 +
<!-- checked on 10/07/2023 08:21:46 pm -->