Paya Lebar MRT station
Paya Lebar MRT station (EW8/CC9) is a Mass Rapid Transit (MRT) interchange station on the East West Line and Circle Line in Geylang, Singapore.
EW8 CC9
Paya Lebar 巴耶利峇 பாய லேபார் Paya Lebar Rapid transit | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Station statistics | ||||||||||||||||
Address | 30 Paya Lebar Road Singapore 409006 (EWL) 15 Paya Lebar Road Singapore 409049 (CCL) | |||||||||||||||
Coordinates | 1°19′04″N 103°53′33″E / 1.317767°N 103.892381°ECoordinates: 1°19′04″N 103°53′33″E / 1.317767°N 103.892381°E | |||||||||||||||
Lines | East West Line Circle Line | |||||||||||||||
Connections | Bus, Taxi | |||||||||||||||
Structure | Elevated (East West Line) Underground (Circle Line) | |||||||||||||||
Levels | 2 | |||||||||||||||
Platforms | 6 (3 island platforms) | |||||||||||||||
Tracks | 2 (East West Line) 3 (Circle Line) - 2 in regular operation | |||||||||||||||
Parking | Yes (Paya Lebar Square, Singpost Centre, Paya Lebar Quarter, KINEX) | |||||||||||||||
Bicycle facilities | Yes | |||||||||||||||
Other information | ||||||||||||||||
Opened | 4 November 1989 17 April 2010 (Circle Line) | (East West Line)|||||||||||||||
Electrified | Yes | |||||||||||||||
Accessible | ||||||||||||||||
Code | EW8 CC9 | |||||||||||||||
Fare zone | 2 | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
It is named after the Paya Lebar Road, not the area called Paya Lebar. It is in the Geylang district.
History
This station was opened on 4 November 1989, as part of the East West Line. Its former code is E5. The Circle Line station platforms was opened on 17 April 2010.
A track fault at Paya Lebar delayed trains travelling towards HarbourFront on 31 December 2012. SMRT had called in staff to manually drive the trains between Dakota and MacPherson to navigate the fault. Circle Line trains began running normally again more than four hours after the fault took place around 8 am.[1]
Station Information
There are two links between the elevated East West Line station and the underground Circle Line station. The first link consists of a series of escalators to the Circle Line concourse from the western side of the East West platform, which is a common link to go to the Circle Line station. The second link, which is barrier-free, was built on the former area of Exit A which has been closed since late 2007 for reconstruction.
For the East West Line, train platforms are on Level 2. For the Circle Line, train platforms are on Basement 2. This is the only interchange station that has a middle track on the underground line, and it is the terminus for short-working trips after peak hours.
Paya Lebar MRT Station Media
Related pages
References
- ↑ Delays on Circle and North-South lines due to faults. The Straits Times. 3 January 2013. http://motoring.asiaone.com/Motoring/News/Story/A1Story20130101-392834.html.[dead link]
Other websites
Media related to Paya Lebar MRT Station at Wikimedia Commons