Sherbino Wind Farm

The Sherbino Wind Farm is in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which will be able to create 750 MW, is in operation. Phase I uses 50 Vestas V-90 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.[1]

Sherbino Mesa Wind Farm
CountryUnited States
LocationPecos County, Texas
Coordinates30°48′39.6″N 102°21′43.2″W / 30.811000°N 102.362000°W / 30.811000; -102.362000Coordinates: 30°48′39.6″N 102°21′43.2″W / 30.811000°N 102.362000°W / 30.811000; -102.362000

Related pages

References